Tecno Android Phones, Samsung Imei Repair, Huawei Mediapad, Official Firmware/ Flash File, WiFi, Alcatel One, Flash Tool Windows, Android Jelly Bean

New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)

New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014) - we say welcome to the blog Tecno Android Phones we provide a lot of latest gadget information that must be very dear for you to miss, now we will discuss first about New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014) we have collected a lot of information to make this article to complete for you, Please read:

Articles : New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)
full Link : New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)
Article December 17 2014 loadshedding schedule, Article download loadshedding schedule routine push 2 2071, Article loadshedding, Article loadshedding poush 2 dec 17, Article Nepal, Article New loadshedding schedule 2014, Article Push 2 2071 loadshedding routine,

You can also see our article on:


New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)

NEA (Nepal Electricity Authority)- the government owned sole authority for generating and distributing electricity in the country, has announced fresh schedule of loadshedding in the country. With the new loadshedding schedule effective from December 17, 2013 (Poush 2, 2070), there will be eleven hours power cut for 2 days, 10.5 for one day and 9.5 for four days.
Due to reduction of water level in the river, the country falls short of about 400 Mega watt electricity compelling to cut the power for 63 hours per week, which may be increased more during the dry season. The new loadshedding from poush 2, Wednesday will be having two shifts of power cut ( four to 6 hours in a shift).
Here is the new loadshedding schedule effective from Poush 2 Wednesday (Dec 17, 2014)
Click the picture to enlarge.




Articles about New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014) finished discussed

We think it is enough information about New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014), hopefully the information we give can give benefit for you,

If you feel the information New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014) that we provide can provide benefits for others please share with link https://southernmatron.blogspot.com/2014/12/new-loadshedding-schedule-nepal.html thank you for visiting our blog page and do not forget to visit other pages.

Tag : , , , , , , ,
Share on Facebook
Share on Twitter
Share on Google+

Related : New Loadshedding schedule Nepal effective from Poush 2, 2071 (Dec 17, 2014)

0 komentar:

Post a Comment